Smith Acetylene Torch
View
Options
Preview new Authoring Experience
History
1
2
3
4
5
Introduction
Details
Guide Steps
Review
Quiz
Leak testing must be done on a weekly basis. Check the latest date on the leak test sheet nearby. If a leak test has not has not been done in the past 7 days, perform a leak test.
Make a soapy water mixture (1/2 cup water and 3-4 squirt dish soap from the sink dispenser.)
Brush the soapy water mixture all the way around all 5 Acetylene gauge and tank joints and fittings.
Brush the soapy water mixture all the way around each of the torch hose fittings.
If bubbles form, turn off all valves starting at the tanks and contact Heather (517) 203-6482
If the leak test is successful and no bubbles are seen, mark today's date on the sheet above the torch.
« Introduction
Next »
Your contributions are licensed under the open source Creative Commons license.
Next line
Previous line
Insert a new line below
Insert a new line above
Indent current line
Unindent current line
Delete current line
Navigate to next step.
Navigate to previous step.